Installation method
1. Control the distance of the aisle according to the process flow chart, place the side feet at both ends of the unit, and pull the positioning line. The distance between the feet on both sides should be equal, and the diagonal should be equal 2, in order to place other side foot alignment positioning line, lateral side foot distance is placed by the width of the composite floor, side foot and foot distance is placed by the length of the composite floor 3. Place the composite floor horizontally between the side foot and the middle foot and screw it down. Pig positioning bar is composed of positioning bar side bar, positioning bar partition, positioning bar front door, positioning bar back door, composite floor, horizontal bar, middle foot, side foot, screw and so on. Scope of application: it is suitable for fixed point feeding of sows during pregnancy.Basic equipment installation requirements: In order for the positioning bar to be used normally and its service life, the piggery construction needs to meet the following conditions: The product is installed on the cement floor platform of the piggery already built, and the platform should be flat.Welcome to Discuss these Issues with us!
Zalo
Line